TOUGH TONGUE AI
  • Home
    LogoTOUGH TONGUE AI

    RESOURCES

    Loading...

    HomeLibraryAG&E — Case Interview (Easy)

    AG&E — Case Interview (Easy)

    AG&E — Case Interview (Easy)

    Overview

    Interviewer-led mock case interview: AG&E, Delaware's sole utility, faces a renewable-energy mandate. Compare buying clean energy credits against building a wind farm, work out the customer-rate impact, weigh the trade-offs — and spot the regulatory twist that changes the answer. Exhibits appear live on screen.

    Your Instructions

    Your role

    • You are the candidate in an interviewer-led case based on AG&E (The Ultimate Case Interview Workbook, Practice Case #7 — rated Easy).
    • Exhibits appear on the embedded slides as each phase begins — don't read ahead; let the interviewer drive the deck.
    • Have pen and paper ready.
    • Budget: ~25–30 minutes. "Easy" means the bar is flawless execution: clean setup, no unit slips, and the case's signature insight surfaced without prompting.

    The case at a glance

    • Client: AG&E, a utility company and the sole provider of utilities in Delaware. All of its 2M MWh of annual capacity comes from nonrenewable sources (coal and petroleum). As a regulated utility, it cannot earn more than 15% of its assets as income.
    • Trigger: A new government mandate — for every MWh produced from nonrenewable sources, 0.05 MWh must be produced from renewable sources.
    • The ask: Choose between (A) buying clean energy credits from a third party (which count as renewable production) or (B) building a wind farm.
    • Worth asking about up front: the exact mandate ratio, the meaning of the 15% income cap (income is capped at 15% of asset value — this becomes decisive later), and whether credits fully satisfy the requirement (they do).

    Phase 0 — Framework (~4–5 min)

    • What happens: You're asked how you'd structure the problem.
    • How to approach: Four buckets cover the ground; you don't need these exact ones.
    • Reference answer: Costs (wind farm build + run vs credit cost, on a comparable basis) · Benefits (goodwill with customers and government; whether adding assets lets a regulated utility earn more income) · Capabilities (capital and expertise to build and operate a wind farm) · Risks (construction risk vs credit-price risk, and manageability).
    • Watch out: The throughline skill is comparing a recurring operating cost against a one-time capital cost — which forces you to annualize — while keeping the 15%-of-assets income cap in view.

    Phase 1 — Which option is cheaper? (~6 min, Exhibit 1: slide 2)

    • What happens: You get the cost inputs: credit price $40/MWh today ($10 three years ago); turbines $4,000 per 1 MWh of annual capacity; 40-year lifespan; zero maintenance.
    • How to approach: First pin down compliance volume — the mandate is per MWh of nonrenewable output. Credits are a recurring cost (price × volume). The wind farm is one-time capital — put it on the same per-year basis by spreading the build cost over its 40-year life.
    • Reference answer:
      • Requirement: 2M × 0.05 = 100K MWh per year
      • Credits: 100K × $40 = $4M per year
      • Wind farm: $4,000 × 100K = $400M to build → over 40 years = $10M per year
      • Credits are cheaper — $4M vs $10M per year.
    • Watch out: Don't compare $400M to $4M and stop — annualize first, or the wind farm looks 100× worse instead of 2.5×. And the $10 three-years-ago price is not noise — park it; it becomes the strongest argument in the recommendation (prices have quadrupled).

    Phase 2 — What happens to customer rates? (~5 min, Exhibit 2: slide 3)

    • What happens: Customers absorb all costs. Credits push the rate from $0.25 to $0.26 per kWh. What's the rate with the wind farm?
    • How to approach: Work in ratios, not kWh — you don't know total kWh sold and don't need it. The rate increase scales with the cost passed through.
    • Reference answer: $0.25 → $0.26 is a 4% increase for $4M/yr. Wind farm is $10M/$4M = 2.5× the cost → 2.5 × 4% = 10% increase → $0.25 × 1.1 = $0.275 per kWh.
    • Watch out: The tempting wrong move is adding $0.01 × 2.5 = $0.025 to $0.26 — both increases are measured from today's $0.25 base; the options are alternatives, not add-ons. Keep units straight ($/MWh vs $/kWh) — the ratio method sidesteps the conversion, which is exactly why it's right.

    Phase 3 — Advantages and disadvantages (~5 min, slide 4)

    • What happens: A brainstorm — pros and cons of credits vs the wind farm. Structure beats volume: both sides for both options.
    • Reference answer:
      • Credits — for: cheaper today; quicker to implement; easy to change course if the regulation changes.
      • Credits — against: prices rising drastically ($10 → $40) and could keep rising; never actually produces clean energy — not a long-term solution.
      • Wind farm — for: improves brand image with customers and government; grows the asset base, raising the maximum income AG&E may earn under the 15%-of-assets cap.
      • Wind farm — against: large upfront outlay; slower to implement; needs expertise AG&E may lack; hard to reverse.
    • Watch out: The income-cap point is the case's signature insight and the one most candidates miss: for a regulated utility, a $400M asset isn't just a cost — it raises the income ceiling. Bonus credit: a break-even note — credits lose their edge if prices rise another 2.5× to $100/MWh — shows you stress-testing your own Phase 1 answer.

    Phase 4 — Recommendation (~3 min, slide 5)

    • What happens: The CEO walks in. No time to prepare — this case expects the recommendation delivered immediately.
    • Reference answer: Either side is defensible. The book's sample goes wind farm, on three legs: regulatory economics (the 15% cap means $400M of new assets directly raises allowable income — credits can never deliver that), cost trajectory (credits only win at today's $40; at the historical trend the credit bill overtakes $10M/yr), and strategic position (real renewable capacity, better standing with customers and regulator). Next steps: confirm capital and expertise; assess construction and operating risks.
    • If you'd rather recommend credits: lead with the 2.5× cost gap and the lower rate impact ($0.26 vs $0.275), propose hedging with long-term credit contracts — but acknowledge the income-cap point or it won't be credible.
    • Watch out: Expect one push-back drawn from your own reasoning (e.g., "it costs 2.5× more — why is that good for customers?"). Defend with your numbers, don't switch sides.

    General tips

    • Clarifying info is revealed only when you ask.
    • State units every time — $/MWh vs $/kWh, per-year vs one-time. On an easy case the interviewer notices sloppy units more than slow math.
    • A "why?" probe on a correct answer tests depth, not error — go one level deeper, don't backtrack.
    • Scoring weights: Structure & Problem Solving 25% · Quantitative Accuracy 30% · Business Judgment & Insight 20% · Communication 15% · Recommendation & Risks 10%.

    More in MBB Case Interview Prep: AI Coach Edition

    • Electro Chargers Case Interview (Wharton Casebook Case 1)
    • Happy Bellies Case Interview (Wharton Casebook Case 2)
    • Smart Radiators Case Interview (Wharton Casebook Case 3)
    • Surfside — Case Interview (Hard)
    • Polystore — Case Interview (Medium)
    • Hens Co. — Case Interview (Medium)
    • Fruit Drink Co. Case Interview (Wharton Casebook Case 6)
    • PSU Bank Co. Case Interview (Wharton Casebook Case 5)
    • Compressor Co. Case Interview (Wharton Casebook Case 4)
    • Lux Rides Case Interview (Wharton Casebook Case 9)
    • Coolant Co. Case Interview (Wharton Casebook Case 8)
    • Race to the Bottom Case Interview (Wharton Casebook Case 7)
    View the full course (116 sessions) →