Your role
You are the candidate in a first-round consulting case interview (interviewer-led). The AI interviewer presents the Avalon case from the Kellogg casebook. The case room beside the call shows each exhibit when its part begins, and your own numbers as you say them. Tap Enter the case to start. Have pen and paper ready; budget about 30 minutes.
The case at a glance
Your client is the Avalon government's Department of Energy. Avalon is a small developing country with GDP growth averaging 5% for a decade. Electricity demand is rising with the economy, and the department must add new power plants — solar, wind, coal, natural gas, nuclear are all on the table. The government wants to know which type of power plants to build, and what factors to consider.
Phase 1 — Structure (~5–7 min)
- What happens: You'll be asked to lay out a framework. Ask clarifying questions first — geography and natural resources, market structure, and the government's actual objectives all pay off later.
- How to approach: This client is a government, not a company — profit is only part of the objective. Think in terms of stakeholders and impacts.
- Reference structure: (1) Economic impact / energy equity — cost and investment required, jobs created, local GDP; (2) Environmental impact / sustainability — CO2 and greenhouse gases, air pollution (PM2.5), water pollution, land use, waste; (3) Security — dependence on imported resources, diversification across sources, intermittency of renewables.
- Watch out: A purely commercial framework will get probed ("What else might a government care about that a private company wouldn't?"). Creativity is explicitly rewarded in this case.
Phase 2 — Capacity math (Exhibit A) (~7–8 min)
- What happens: Using demand and supply projections, calculate how much capacity Avalon must add by 2025 and by 2030.
- How to approach: Required capacity = projected demand × 1.2 (the government mandates a 20% buffer above demand). Subtract projected supply. Remember capacity added in 2025 still exists in 2030.
- Reference answer: 2025: 6.0 × 1.2 = 7.2 GW required; 7.2 − 4.9 = 2.3 GW to add. 2030: 7.3 × 1.2 = 8.76 GW required; 8.76 − 4.3 = 4.46 GW total gap, minus the 2.3 already added = 2.16 GW more (about 2.2).
- Watch out: Two bonus insights earn real credit — the 2-year construction lead time (building must start by 2023 and 2028), and the current inefficiency: today's demand of 4.0 GW only requires 4.8 GW of capacity, yet supply is 5.4 GW, so 0.6 GW of investment is wasted. Talk your math through aloud — if you slip, the interviewer will ask you to walk through it rather than correct you.
Phase 3 — Cost analysis (Exhibit B) (~8–10 min)
- What happens: Compare a wind farm, a solar farm, and a natural gas plant on cost.
- How to approach: Convert everything to a common unit — ideally $/kWh. Steps: (1) lifetime running hours = 24 × 365 × load factor × lifetime; (2) total fixed cost = CAPEX + fixed O&M × lifetime; (3) divide fixed cost by running hours; (4) add variable O&M. Round aggressively.
- Reference answer: Running hours — wind ~65,700 (~65k), solar 17,520 (~17.5k), gas ~140,160 (~140k). Fixed cost per kW — wind $1,300, solar $1,000, gas $1,600. Per kWh — wind ~$0.02, solar ~$0.057, gas $0.011 + $0.005 variable = ~$0.016. Natural gas is cheapest.
- Watch out: Ask about cost of capital (the case assumes none — asking earns credit). Note that gas's variable cost is ~31% of its total cost, meaning its economics depend on imported fuel prices — a real risk for an island with no domestic gas.
Phase 4 — Recommendation (~3–5 min)
- What happens: "The energy minister is walking in — what do you recommend?"
- How to approach: Stance first, then supporting numbers, then risks, then next steps.
- Reference answer: On cost alone, natural gas wins — but a strong answer weighs the non-cost factors (emissions, import dependence, intermittency, foreign investors' preference for clean energy) and a diversified mix is a defensible, even strong, recommendation. Whatever you choose, you MUST name its risks: gas price volatility, fuel access, environmental protests, intermittency (if renewables), and the large capital burden on a developing country.
- Watch out: Expect one pushback drawn from your own analysis. Defend or adapt — composure here is scored.
General tips
- The interviewer reveals clarifying information only when you ask — so ask.
- Expect a "why?" probe even on correct answers; it's testing depth, not signaling a mistake.
- One structured, top-down answer at a time beats a stream of thoughts.
- Your session report will score structure (25%), quantitative accuracy (30%), business judgment (20%), communication (15%), and recommendation & risks (10%).