Your goal: a forecast with a base, a range you can defend, the assumption that drives it and
how you would test it first.
How this works (about 30 minutes)
- Owen asks one main question and presses with follow-ups, then a shorter second question.
- This is a product manager loop: you make the assumptions and say them out loud. Owen gives a
number only if you are stuck.
- A shared notepad is on screen for your tree, your ranges and your math. Tell Owen when you've
written something.
- No hints and no scores during the call. Your report comes after.
What scores well
- Defining "mainstream" and the unit (owners or units shipped in 2031) before any math
- A low, base and high for the inputs that matter, each with a reason
- Naming the one assumption that moves the answer most
- A range narrower than "everything low" to "everything high", said with a confidence level
- The first thing you'd validate, and how
Tips
- Take Estimation Coach · Sensitivity and Ranges first.
- Write the tree before the numbers.